The average is 4-7 years, but the return itself is influenced by sub-factors such as the size of the power plant, the quality of its design, the amount and management of overflows, but especially the number of apartments in the building
A common point of consumption allows electricity to be used completely normally and without any change. Now, without adjusting the secondary electricity meters, no, but from June 2023, community energy will be newly introduced, and then yes.
In compliance with all legal requirements, it is possible to disconnect the consumption of the given place so that the debt does not increase. It is the same as in the case of bills for water or heat.
Yes, the entire SVJ will have its own supplier to choose from.
Electricity meters are replaced as standard in one day after agreement with the electricity distributor. energy. Electricity meters are unsealed and disconnected on the day. Subsequently, the installation of the subordinates takes place
electricity meters.
Currently, up to 50% can be obtained from the New Green Savings program from the total investment.
In this case, it is a simple resale of electricity from SVJ to individual apartment owners in a total amount equal to the purchase from the supplier and at the same price. It is therefore not a business plan, but about meeting the needs of individual apartments and non-residential spaces. Since this resale is not in the nature of a business, no license is required.
Overflows are sent to the network. The system should be dimensioned with regard to the current consumption of the entire house and an adequate PV system should be chosen for this.
In the event of a change in the recommended operating parameters (voltage, temperature, etc.), the battery system triggers an instruction to disconnect the cells from the inverter and declares a fault.
The size of the accumulator depends on the size of the FVE (standard size is approximately the size of a refrigerator). The location is consulted in advance on the SVJ committee. However, the standard is the location in the basement, technical room, or where it is technically and safely possible.
Subsidiary electricity meters are owned by SVJ. When exchanging them for the original electricity meters, everything is done in cooperation with the distributor.
FVE uses the light component of radiation, which is not negligible even during the winter months. The panels thus produce energy even when the sun shines significantly less and is lower. In the conditions of the Czech Republic, solar panels with an output of 1kWp will produce approximately 1000 kWh per year. In the winter months, the PV plant on the apartment building produces between 30 and 351 TP3T of the total electricity consumption in the building.
We will handle everything with the consent of SVJ
SVJ/BD or the management company that does settlement for SVJ/BD.
In the event of the termination of the collection point, which is the case, no fee or penalty is payable.
We will handle the entire process for you, which is part of our price offer. We design the entire project in such a way that it meets the conditions of the subsidy allocation.
We specialize on large and small photovoltaic power plants. We will take care of your project from A to Z.
info@transference.cz
© 2023 Transference Century s.r.o. Trademarks and brands are the property of their respective owners. Web by studio BOXART
We also became a member of the Guild for Accumulation and Photovoltaics